Sites should prepare specifications that OEMs/suppliers confirm are met for flammable liquid lines on mobile plant. These engineering specifications should meet site requirements for filling, operation, maintenance and integrity during normal and any incident/emergency situation.
BI-02A.48 Flammable liquid line specifications are detailed for mobile equipment
Last Updated: 24/04/2020 11:40:19am