Over-speed management is inadequately considered in mine design and work planning, caused by:
- * Not setting the speed limit correctly (too high for geometry/traffic or too low and encouraging non-conformance)
- * Setting cresting speed limits but not delineating the crest
- * Decline gradient
This Credible Failure mode is addressed by:
- BI-00D.01 There is a documented site Traffic Management Plan
- BI-00S.01 Senior management review, update, and confirm the Traffic Management Plan as being fit-for-purpose by senior management:
- BI-01P.07 Site specific travelling speed information prepared for vehicle operators
- BI-04P.01 Vehicle interactions are considered as part of the short-term planning processes
- BI-05D.01 Clear accountabilities for managers, superintendents and supervisors are included in comprehensive, site relevant road design guidelines and traffic management plans
- BI-05S.03 Hazard and incident reporting process that generates value adding corrective actions