Step 3: Confirm Existing VI Control Effectiveness (Phase 2)
This phase ensures that existing VI controls are robust, reliable and practical BEFORE investing in enhanced and/or new VI controls.
Detailed information is provided in the EMESRT Vehicle Interaction Control Improvement Project Guide 2020 below
WBS3 – Phase 2 Existing VI Control Effectiveness
3.1 Site Control Framework (CFw) validation
This resource describes the progression from phase 1, baseline preparation to a review of the baseline by a mix of personnel.
An approach to conducting validation of a site specific Control Framework is described [More...]
3.3 User Requirements
This resource describes how to confirm that VI controls are robust, reliable and practical. This is an important step BEFORE progressing to any technological solution [More...]